Macao Light Rapid Transit Corporation Limited says East Line will have city’s first underwater tunnel that will be operational regardless of the weather conditions.
Transport Bureau Director Kelvin Lam Hin San
Four new rail lines should be running by 2028; 10 kilometres of elevated walkways to thread their way above city’s most congested areas; electric-powered vehicles to be encouraged.